West End Zone

Phase 2 of the stadium renovations are complete at Clemson's Memorial Stadium.

McGillicuddy Concrete has been hard at work at Clemson Memorial Stadium, now finishing the West End Zone after a successful first phase at the East End Zone.

Our most recent work at the renewed Clemson football stadium included: the Tiger Walk and retaining walls around the parking lot, modifications to the tunnels inside the stadium, and locker room renovations.

The Tiger Walk, which is part of the new Rogers Family Parking Lot, was upgraded so that football players and fans can safely park and enter the stadium. As part of the Rogers Family Parking Lot renovations, McGillicuddy Concrete also built multiple retaining walls around the perimeter of the lot to help prevent flooding and soil erosion.

Inside the stadium, our team closed off two existing tunnels on the west end, adding footings for the new bleachers. We also helped to add a center tunnel behind the west end zone to allow players to enter and exit the field for warmups directly from the locker room.

Request a Proposal

Tiger Walk
Left tunnel
locker room tunnel
retaining wall in parking lot
stairs to parking lot

The McGillicuddy Story

Miguel Murillo and Sean McGillicuddy began this business with one simple vision: be the best concrete contractor by providing excellence in quality and service for commercial clients. This “best in quality and service” vision is the guiding principle that our team carries with them on every job site. For McGillicuddy, it’s not about landing the biggest project, it’s about doing the best commercial concrete work possible for each and every client.

Every member of our leadership team has risen up through the ranks. We know how the job is supposed to be done, because we’ve done every job. We’ve been laborers who rose to project superintendents and beyond. This is why we’re so dedicated to training quality employees and building the best team in the business.

Hire McGillicuddy Join Our Team

Error Message